MRT Putrajaya Line absolutely opens March 16, 3pm – 57.7km from Kwasa Damansara to Putrajaya Sentral
1 min read
After working on Part One with 12 stations since June 2022, the complete route of the MRT Putrajaya Line will lastly be absolutely open on March 16 2023 at 3pm.
The complete line is 57.7 km lengthy from the Kwasa Damansara station all the best way to Putrajaya Sentral station, with 36 stations alongside the best way. There are one other 5 stations deliberate for future use that are RRI, Bandar Malaysia Utara, Bandar Malaysia Selatan, Taman Teknologi and Taman Universiti. Of the full 57.7 km size, 44.2 km is elevated whereas 13.5 km is underground.
There are a complete of interchanges stations with different traces alongside the best way. For instance, you possibly can interchange with the MRT Kajang Line at Kwasa Damansara and TRX stations. Sungai Buloh and Sri Damansara Timur stations interchange with KTM Komuter. From Putrajaya Sentral, it is possible for you to to take the ERL (KLIA Categorical) to KLIA/KLIA2. For a full record of interchange stations, please consult with the MRT Putrajaya Line map above, or the complete Klang Valley built-in map beneath.
Every prepare set on the MRT Putrajaya Line can have 4 automobiles, and prepare frequency is designed to be 4 minutes throughout peak hours and 6 minutes throughout off peak hours.
Many within the south of the Klang Valley have been eagerly awaiting the opening of the complete line. Are you glad it’s lastly going to be absolutely open?